When using `HARNESS_JOBS` to run the tests in parallel, no matter the
level of parallelism that can be used, the monolithic `test_fuzz` takes
a long time to run, conditioning the duration of the whole build.
This commit splits the single `test_fuzz` recipe into separate recipes
for each fuzzer.
The previous mechanism to select individual fuzz tests using the
`FUZZ_TESTS` environment variable is also dropped (and documentation
updated).
Reviewed-by: Richard Levitte <levitte@openssl.org>
(Merged from https://github.com/openssl/openssl/pull/13307)
Make the improved semantics of VFO replace the previous VF and remove VFO
Add warnings about overriding use of HARNESS_VERBOSE* variables
Reviewed-by: Paul Dale <paul.dale@oracle.com>
(Merged from https://github.com/openssl/openssl/pull/12279)
The environment variable `HARNESS_JOBS` can be used to control how many
jobs to run in parallel. The default is still to run jobs sequentially.
This commit does not define custom `rules`, and different versions of
`TAP::Harness` come with different strategies regarding the default
`rules` that define which test recipes can be run in parallel.
In recent versions of Perl, unless specified otherwise any task can be
run in parallel.
Reviewed-by: David von Oheimb <david.von.oheimb@siemens.com>
(Merged from https://github.com/openssl/openssl/pull/12326)